Well I did another scale model with both the floor radius and the side radius and it should match up nicely...One thing that's critical in this situation is both the floor narrowing radius and the sidewall rake {radius} obviously need to be the same lengthwise measurements for them to meet correctly in the front...So when I get to tha actual aluminum sheet mock-up I need to double check everything is coming together..

Papee I know you had breifly stated in another build that you prefer to start at the bow and work tward the transom to tack in the sheeting...Would this still be a good plan of attack seeing how I've already got the sheets to the full 14 ft length ??? What's the advantage to say starting at the transom and working front ??